Frequency of Values (difference between two assets)
Last updated 9 November 2026
Function reference › Risk and Performance Measures › Frequency
1 GIAnalyzer function for Excel. Optional arguments are shown in [brackets].
GIA_RPM_FrequencyValues2
Returns the frequency of times (quantity or probability) in which the difference beween two values meets a chosen criteria, during a specified period, given historical values.
GIA_RPM_FrequencyValues2(HDates1, HRates1, HDates2, HRates2, Condition, Value1, Value2, OT, StartDate, EndDate, ExcludeFromDate, ExcludeToDate)Returns: Frequency of times (quantity or probability) in which the difference beween two values meets a chosen criteria, during a specified period
| Argument | Use | Description |
|---|---|---|
HDates1 | Required | The array of dates of historical prices of asset 1. |
HRates1 | Required | The array of historical prices of asset 1. |
HDates2 | Required | The array of dates of historical prices of asset 2. |
HRates2 | Required | The array of historical prices of asset 2. |
Condition | Required | The criteria that defines which changes will be chosen (Below, Above, BelowOrAbove, Between, Equal) |
Value1 | Required | The lower value to which the condition is related if the condition is "BelowOrAbove" or "Between".The value to which the condition is related if the condition is "Below" or "Equal". |
Value2 | Required | The upper value to which the condition is related if the condition is "BelowOrAbove" or "Between".The value to which the condition is related if the condition is "Above". |
OT | Required | Output type (Quantity, Probability) |
StartDate | Required | The first date in the required period. |
EndDate | Required | The last date in the required period. |
ExcludeFromDate | Required | The first date in the period excluded from the required period. |
ExcludeToDate | Required | The last date in the period excluded from the required period. |
