Cross-Currency Swap – CCS, amortizing (pay floating IBOR – receive floating RFR)

Last updated 20 November 2026

Function reference › Interest Rate Derivatives › Cross Currency Swap

2 GIAnalyzer functions for Excel. Optional arguments are shown in [brackets].

GIA_IRD_CCSAmortIBORRFR_Risk

Returns the risk measures (DV01, Macaulay/Modified Duration, KR01, Bucket DV01, Key Rate/Bucket Duration) of a cross-currency swap with an amortizing schedule with both legs floating (pay IBOR, receive RFR).

GIA_IRD_CCSAmortIBORRFR_Risk(EDate, NE0, NE1, FPPD, FrPP, PPP, DR, NotP, SpP, LRP, EfDateP, CFrP, DaysP, NotR, SpR, LRR, EfDateR, CFrR, DaysR, S, DCurveDatesP, DCurveRatesP, FCurveDatesP, FCurveRatesP, DCurveDatesR, DCurveRatesR, FCurveDatesR, FCurveRatesR, HDatesR, HRatesR, VDate, SDate, Comp, Days, Interp, CurP, RM, OT, OC, CalcType, [StartTerm], [EndTerm])

Returns: Risk measures (DV01, Macaulay/Modified Duration, KR01, Bucket DV01, Key Rate/Bucket Duration) of a cross-currency swap with an amortizing schedule with both legs floating (pay IBOR, receive RFR)

ArgumentUseDescription
EDateRequiredThe expiry date.
NE0RequiredWhether the notional amount is being exchanged at the start. (Yes, No)
NE1RequiredWhether the notional amount is being exchanged at expiry. (Yes, No)
FPPDRequiredThe first date of the principal payment.
FrPPRequiredThe frequency of principal payments (Annual, SemiAnnual, Quarterly, Monthly)
PPPRequiredThe percent of the principal in each payment.
DRRequiredThe date rolling method. Non-business days are Saturdays and Sundays; holidays are not supported (Following, ModifiedFollowing, Previous, ModifiedPrevious, NoAdjustment)
NotPRequiredThe notional amount in the pay leg of the swap.
SpPRequiredThe spread (in basis points) in the pay leg of the swap.
LRPRequiredThe last reset rate of the reference interest rate in the pay leg of the swap.
EfDatePRequiredThe original effective date in the pay leg of the swap.
CFrPRequiredThe frequency of coupons in the pay leg of the swap (Annual, SemiAnnual, Quarterly, Monthly)
DaysPRequiredThe time basis in the pay leg of the swap (act/360, act/365, act/act, 30E/360, 30I/360)
NotRRequiredThe notional amount in the receive leg of the swap.
SpRRequiredThe spread (in basis points) in the receive leg of the swap.
LRRRequiredThe last reset rate of the reference interest rate in the receive leg of the swap.
EfDateRRequiredThe original effective date in the receive leg of the swap.
CFrRRequiredThe frequency of coupons in the receive leg of the swap (Annual, SemiAnnual, Quarterly, Monthly)
DaysRRequiredThe time basis in the receive leg of the swap (act/360, act/365, act/act, 30E/360, 30I/360)
SRequiredThe FX spot rate.
DCurveDatesPRequiredThe array of dates in the interest rate curve used for discounting cash flows in the pay leg of the swap.
DCurveRatesPRequiredThe array of rates in the interest rate curve used for discounting cash flows in the pay leg of the swap.
FCurveDatesPRequiredThe array of dates in the interest rate curve used for calculating forward interest rates, in the pay leg of the swap.
FCurveRatesPRequiredThe array of rates in the interest rate curve used for calculating forward interest rates, in the pay leg of the swap.
DCurveDatesRRequiredThe array of dates in the interest rate curve used for discounting cash flows in the receive leg of the swap.
DCurveRatesRRequiredThe array of rates in the interest rate curve used for discounting cash flows in the receive leg of the swap.
FCurveDatesRRequiredThe array of dates in the interest rate curve used for calculating forward interest rates, in the receive leg of the swap.
FCurveRatesRRequiredThe array of rates in the interest rate curve used for calculating forward interest rates, in the receive leg of the swap.
HDatesRRequiredThe array of dates of historical rates of the floating interest rate in the receive leg of the swap.
HRatesRRequiredThe array of historical rates of the floating interest rate in the receive leg of the swap.
VDateRequiredThe value date.
SDateRequiredThe spot date.
CompRequiredThe compounding basis of the interest rates (Annual, SemiAnnual, Quarterly, Monthly, Simple, Continuous)
DaysRequiredThe time basis of the interest rates (act/360, act/365, act/act, 30E/360, 30I/360)
InterpRequiredThe interpolation method (Linear, LogLinear, CubicSpline, Exponential)
CurPRequiredWhether the currency of the pay leg is base or counter (Base, Counter)
RMRequiredThe risk measure type (DV01, MacaulayDuration, ModifiedDuration, KR01, BucketDV01, KRDuration, BucketDuration)
OTRequiredThe output type of the value/risk. (PayLeg, ReceiveLeg)
OCRequiredThe currency in which the DV01 is expressed (InBaseCurrency or Base, InCounterCurrency or Counter)
CalcTypeRequiredThe floating leg calculation method; Approx is the default (Approx, Exact)
StartTermOptionalThe starting term for Bucket and Key Rate measures.
EndTermOptionalThe ending term for Bucket and Key Rate measures.

See also: GIA_IRD_CCSAmortIBORRFR_Value

GIA_IRD_CCSAmortIBORRFR_Value

Returns the value of a cross-currency swap with an amortizing schedule in which the interest rates in both legs are floating (pay IBOR, receive RFR).

GIA_IRD_CCSAmortIBORRFR_Value(EDate, NE0, NE1, FPPD, FrPP, PPP, DR, NotP, SpP, LRP, EfDateP, CFrP, DaysP, NotR, SpR, LRR, EfDateR, CFrR, DaysR, S, DCurveDatesP, DCurveRatesP, FCurveDatesP, FCurveRatesP, DCurveDatesR, DCurveRatesR, FCurveDatesR, FCurveRatesR, HDatesR, HRatesR, VDate, SDate, Comp, Days, Interp, CurP, OT, OC, CalcType)

Returns: Value of a cross-currency swap with an amortizing schedule in which the interest rates in both legs are floating (pay IBOR, receive RFR)

ArgumentUseDescription
EDateRequiredThe expiry date.
NE0RequiredWhether the notional amount is being exchanged at the start. (Yes, No)
NE1RequiredWhether the notional amount is being exchanged at expiry. (Yes, No)
FPPDRequiredThe first date of the principal payment.
FrPPRequiredThe frequency of principal payments (Annual, SemiAnnual, Quarterly, Monthly)
PPPRequiredThe percent of the principal in each payment.
DRRequiredThe date rolling method. Non-business days are Saturdays and Sundays; holidays are not supported (Following, ModifiedFollowing, Previous, ModifiedPrevious, NoAdjustment)
NotPRequiredThe notional amount in the pay leg of the swap.
SpPRequiredThe spread (in basis points) in the pay leg of the swap.
LRPRequiredThe last reset rate of the reference interest rate in the pay leg of the swap.
EfDatePRequiredThe original effective date in the pay leg of the swap.
CFrPRequiredThe frequency of coupons in the pay leg of the swap (Annual, SemiAnnual, Quarterly, Monthly)
DaysPRequiredThe time basis in the pay leg of the swap (act/360, act/365, act/act, 30E/360, 30I/360)
NotRRequiredThe notional amount in the receive leg of the swap.
SpRRequiredThe spread (in basis points) in the receive leg of the swap.
LRRRequiredThe last reset rate of the reference interest rate in the receive leg of the swap.
EfDateRRequiredThe original effective date in the receive leg of the swap.
CFrRRequiredThe frequency of coupons in the receive leg of the swap (Annual, SemiAnnual, Quarterly, Monthly)
DaysRRequiredThe time basis in the receive leg of the swap (act/360, act/365, act/act, 30E/360, 30I/360)
SRequiredThe FX spot rate.
DCurveDatesPRequiredThe array of dates in the interest rate curve used for discounting cash flows in the pay leg of the swap.
DCurveRatesPRequiredThe array of rates in the interest rate curve used for discounting cash flows in the pay leg of the swap.
FCurveDatesPRequiredThe array of dates in the interest rate curve used for calculating forward interest rates, in the pay leg of the swap.
FCurveRatesPRequiredThe array of rates in the interest rate curve used for calculating forward interest rates, in the pay leg of the swap.
DCurveDatesRRequiredThe array of dates in the interest rate curve used for discounting cash flows in the receive leg of the swap.
DCurveRatesRRequiredThe array of rates in the interest rate curve used for discounting cash flows in the receive leg of the swap.
FCurveDatesRRequiredThe array of dates in the interest rate curve used for calculating forward interest rates, in the receive leg of the swap.
FCurveRatesRRequiredThe array of rates in the interest rate curve used for calculating forward interest rates, in the receive leg of the swap.
HDatesRRequiredThe array of dates of historical rates of the floating interest rate in the receive leg of the swap.
HRatesRRequiredThe array of historical rates of the floating interest rate in the receive leg of the swap.
VDateRequiredThe value date.
SDateRequiredThe spot date.
CompRequiredThe compounding basis of the interest rates (Annual, SemiAnnual, Quarterly, Monthly, Simple, Continuous)
DaysRequiredThe time basis of the interest rates (act/360, act/365, act/act, 30E/360, 30I/360)
InterpRequiredThe interpolation method (Linear, LogLinear, CubicSpline, Exponential)
CurPRequiredWhether the currency of the pay leg is base or counter (Base, Counter)
OTRequiredThe output type of the value/risk. (PayLeg, ReceiveLeg, Total)
OCRequiredThe currency in which the value is expressed (InBaseCurrency or Base, InCounterCurrency or Counter, InOwnCurrency or Own)
CalcTypeRequiredThe floating leg calculation method; Approx is the default (Approx, Exact)

See also: GIA_IRD_CCSAmortIBORRFR_Risk